9209-9201-9035 working a loaded coal train work hard upgrade after the relatively flat run across from Coggan Creek they climb up to Bylong loop where they will level out for a few kms then tackle a long upgrade haul to the 3km long No.3 tunnel and crest the grade halfway through the tunnel.