The last light of the day is quickly fading away as a class 15E electric loco and class 43 diesel (GE C30-ACi) wait in Loop 2 on the Sishen - Saldanha ore line with an empty train behind for an approaching loaded train.
Classes 7E, 9E, 11E, 14E, 15E, 19E, 20E and 21E.
7E & 11E are 25kv AC locos. 9E & 15E are 50kv AC locos and the remainder are dual-voltage (25kv AC & 3kv DC).