During the total reconstruction of the railway tracks in Ramsei, there are no shunting maneuvers possible. To ensure that the RUWA wire welding plant at Sumiswald can be delivered with steel wire, the freight trains must travel through to Langnau, where freight trains can change the direction. This summer, on the Ramsei-Langnau route, you can take photos of freight trains, which is otherwise not possible.