Due to catenary works in Mägenwil during 52 hours, on the east-west mainline of Switzerland, there were much timetable changes, rerouted or cancelled trains. This is the Intercity 10816, running from Zürich HB instead of Romanshorn only, to Bern-Brig, and rerouted from Killwangen via Baden-Brugg-Wildegg to Rupperswil, instead of via Heitersberg tunnel-Lenzburg. Re 460 # 074 is in front, followed by 4 standard cars type IV, then the IC2000 push-pull train with Re 460 # 118 in the rear, running through Wildegg. On the left, diesel shunter Tm 232 # 203 of SBB Cargo.