Posted by Mitch Goldman on May 25, 2017 
Nice view and thanks for documenting and sharing, Steve. Looks like the traded in the S-curve for a C-curve. Will that odd bend be straightened out, slid over or is this simply the result of building around a per-existing bridge without cutting service?
Posted by Steve Carter on May 25, 2017 
Mitch: Pretty much what you see is what will be. The obvious change will be two tracks. Less obvious will be the removal of the switch at the beginning of the platform, and the installation of a crossover at the far end where lies the stack of concrete ties.
- Post a Comment -