Could someone please explain the load
|
EMD Service to GE hahaha
|
Yes sir, an EMD pulling a GE load haha. The GE plant that builds these is in Greenville, SC. So each time one of the turbines is built, they run on Saturday with the CPDR, then Sunday with CSX to the coast for shipment. This particular turbine is a 9F model I believe.
|
|