The austrian railways ÖBB ordered 18 new fire fighting and rescue trains from StadlerRail for the infrastructure department. The first built train X122 # 001 (99 81 9173 007-1) is on a test run 3... (more)
Doubledeck push-pull train with 9 cars of type IC2000 including a cab car Bt, some after rebuilding to "IC2020", and 4 single deck cars as reinforcement in the rear. In front is Re 460 # 071 and i... (more)
Re 620 # 037 (Re 6/6 # 11637) of the SBB pulls the loaded HOLCIM gravel train 67889 from Hüntwangen-Wil via Bülach-Winterthur-Romanshorn joint line to Heerbrugg, between Sulgen and Erlen. The gr... (more)
The new "IRD" (Interregio doubledeck train) RABe 512 # 017 of the SBB, built by StadlerRail, is on a test run 97523 from Sulgen to Romanshorn Süd, running through Erlen and Oberaach. Th... (more)
Two cars (without bogies) of a new 3-car train X15p for the Roslagsbanan in Stockholm/Sweden, on lowloader cars Uaikk of StadlerRail, on the way from the Bussnang works to the Erlen commissioning... (more)