Heading for Beijing South Station.
Train and pedestrian.
Going across the moat.
Lovely evening.
All three just completed operations. SS8-0007 is towing the other two back to locomotive yard.
A harmony afternoon with trains and automobiles.
Automated running? No but this is the end cab (will be the head when running opposite) where driver is unneeded. Photo taken throung the glass window between the cab and the cabin.
An aged locomotive. On the bridge in background lays the Batong metro line.
Tram Line 13 snow day operation.
Photo taken at Wudaokou. Wudaokou means the 5th railway-road cross counted from Beijing North Station, the threshold of Jingbao Railway. This NDJ3 is coming back from the Badaling Great Wall.
A queue of steam locomotives.
The typical view of a road-railway cross in China.
On the way to Tianjin at 333 km/h (208 MPH). Photo showing the luxury seats and the driving room.