RS-30 proceeds into the Pine Aire DEF to make up the rest of it's train before heading back west before the hectic LIRR rush hour.
The RS-30 crew ties down the spotted load at Roberts Plywood.
Due to a mainline shut down east of Ronkonkoma during the day, power of the RS-60 idles waiting for it's next assignment.
NYAR 261 stands by as the 156 runs around due to a speed control failure.
Due to track work on Track 2, RS-30 proceeds to track 1 to head north to Northport.
PD Tower operator Craig Lombardi hands off orders to train 2736, which was 37 minutes late on this brisk November evening.
RS-61 heads west after the run around
RS-30 waiting for clearance via Divide to proceed to Northport