The second built highspeed "Giruno" train, RABe 501 # 002 from Stadler Rail for the SBB, is on a running gear test run through the Aare valley with up to 160 km/h, which is the regular v... (more)
In the last few weeks since july 12th, the second built "Giruno" RABe 501 # 002 from Stadler Rail for the SBB, was equipped with a large amount of sensors, wiring and measuring divices. ... (more)
In the last few weeks since july 12th, the second built "Giruno" RABe 501 # 002 from Stadler Rail for the SBB, was equipped with a large amount of sensors, wiring and measuring divices. This train... (more)
The second train of the new "Giruno" type RABe 501 # 002 from Stadler Rail for the SBB made the first brake test runs on the Thur valley mainline between Sulgen and Romanshorn this day. ... (more)
On this day, the second "Giruno" highspeed train for the SBB, RABe 501 # 002, made it's first brake test runs on the Thur valley mainline between Sulgen and Romanshorn. When the train left the Sta... (more)