On February 02, 2014, a southbound BNSF stack train led by three GE's trundles down the middle of Atwood Street in Longmont, Colorado after a good snow fall.
CP 8940 leads the 499 west out of the Twin Cities in heavy wet March snow. The sticky snow completely covered the number boards.
At dusk, more than one hour late, the combined VIA train from Jonquière and Senneterre, is plowing the tracks, in St-Paulin, after a late winter storm, leaving almost 20 cms of snow on its path
Rio Grande's Pleasant Valley Local pushes new snow through Scofield on its way to the Valley Camp mine on January 17, 1976.
A Wisconsin Northern train rolls through a snow encrusted tree tunnel on its way south after switching industry in Chetek. This line is former Omaha (C&NW) and has seen a rebirth due to fracking s... (more)
A loaded ore train eases through the siding at Highland for a meet after a nice frosting of the trees.
On December 2010 freezing rain fell on Moscow and vicinity. The glaze ice accumulation caused a number of accidents and power outages. Roads, trees, wires covered by a thick layer of ice.
Passengers get a brief glimpse of the mountains as a late "Canadian" VIA #1 approaches Swan Landing, AB in the very last light of the day.
Thundersnow! We heard a rumble from the skies after this train passed by. A normal 5 minute ride to this spot took 20 minutes and was made possible by Jeep 4WD. Incredible storm!
The first train through the teeth of the 2010 blizzard makes easy work of the 2 ft of snow. The HHP was whistling as they blasted through at near 100 mph. Incredible.