NS H02 holding the main at Boonton.
Running in typical NS fashion, rebuilt GP38-3 5638 heads up the Hershey, PA Switcher, NS H03, as it heads to the West Plant of Hershey's Chocolate. Seen passing the main plant and cocoa bean silo... (more)
NS engine 5638 and crew switches the Hershey Plant early on a bright Saturday morning.
Norfolk Southern's Dover Drill NS H02 pulls up towards Bay Street Station to clear the switch at CLAIRE. When the switch is unlocked, the train will reverse back over the switch then pull ahead d... (more)
NS H02 on the Orange Running Track which was the once great eastern end of NJT's Boonton Line. The engine had been recently rebuilt in May of 2006 from NS GP38 2950 (formerly CR 7911/PC 7911).
Drilling an industry on the Totowa Industrial. The locomotive here was recently rebuilt from former GP38 NS 2950 (nèe CR 7911 and PC 7911).
NS H-02 switches the East Dover freight yard.