Vermont Railway train #264 is putting its train together at the yard in Rutland before shortly departing a little after 8pm for its run to the CP interchange in Whitehall NY.
During the longer days of summer it is possible to get the usually nocturnal freight trains on the CalTrain Peninsula line. The Mission Bay Local is putting its train together while in the backg... (more)
A southbound San Diegan loads passengers at Fullerton station during an August sunset. At this time, the new passenger platform for southbound trains (on the left) is not in service yet so they w... (more)
Although the 1995 was the last engine the day before, that meant it would lead the eastbound MSJRV the next day. The railfans were out in force for the occasion. Seen here crossing the bridge at... (more)