Ex C&O/CSX GP39 504 leads today's mine runs as the second train of the day gets under way. The engineer has the trio of GP39s in full dynamics as the train approaches Ray Junction with 42 loads on... (more)
A empty CBRY ore train drifts into the mine and away from the photographers grasp. Within the next hour and half the train will be loaded and readied for another trip to Hayden.
Empties head back to Ray mine for another load of copper ore.
CBR 301 (ex SCL) GP40 is making its first revenue run on the southbound OT-1 at Kelvin, AZ (near Ray Jct.). Unit was delivered to the CBR at Magma Jct on Jan 9, 2012. CBR installed a radio and add... (more)
westbound copper ore train on Kennecott Copper RR coming from Ray Mine to interchange train to SP at Ray Jct, AZ
Fully Loaded Ore train after leaving the Ray Mine
GP39 #504 leads a loaded mine run eastbound near Kelvin, AZ.