Going against the current, UP 5752 is ordered down the #2 track crossing I-80 at the Auburn Ravine. Tie replacement on the #1 track forced the #2 in dual use today.
SP 271 East roars up No. 1 track, built in the early part of the 20th century, which has numerous tunnels and cuts to help reduce the grade compared to the original Central Pacific alignment.