Clear. Cold. Northwest wind. Snow on the ground. Everything is in order as CN 2028 leads ore loads south through the yard here at Biwabik while also passing by a few centerbeams that are being sto... (more)
What started out as CN 2020 leading iron ore loads south will end up being CN 2028 leading iron ore loads south into Two Harbors after the crew swaps leaders due to a mechanical issue. Ultimately ... (more)
2011: "I wish that UP was leading." 2024: "I wish this train still ran here." Classic case of being grateful for the moment. SunRail was still a ways off at this point and th... (more)