The Buffalo & Pittsburgh's WAER rolls south through the swamps of PA State Game Lands Number 109 as it comes into Waterford, Pennsylvania with a trio of GP's hauling nine stone empties over the jo... (more)
Soaring over the Little Mahoning Creek valley on a trestle built by the Pencoyd Iron Works in 1899 and upgraded in 1941, engine 5020 leads three other EMD engines northbound to Riker Yard in Punxs... (more)
Buffalo and Pittsburgh train SIBF (Salamanca, NY - Buffalo, NY) works its way northbound as it passes the ex BR&P interlocking tower at Ashford Junction with a quintet of EMD SD40 variants for pow... (more)
After arriving in Erie, Pennsylvania the B&P's WAERÂ works the transload track alongside the Bayfront Connector. Today the crew would pull stone empties and then drop loads before proceeding to OD... (more)