Having just departed Mt Walton, ACC6030 & ACA6009 take the main line at Jaurdi as they round the curve through the cutting with 3030 loaded MRL ore train.
A lookout over outer-suburban Brigadoon in Perth's Swan Valley sees 7035 empty iron ore train winding the curves near the beginning of its long journey to the minesite at Mt Walton behind locos AC... (more)
During a bout of heavy rainfall, P2503, P2514 & 2512 combine to haul 3769 loaded KML ore train from Perenjori round the final bend into Geraldton port for unloading.
Karara Mining Ltd ore train powers through the straight at Bringo with 4763 lead by ACN4150 & ACN 4170 with ACN 4152 in DPU config at the rear in the distance.
The overnight failure of then lead unit Q4017, allowed for a very nice lash-up and a daylight arrival into West Kalgoorlie for 4025 Kalgoorlie freighter from Perth. After being added to the front ... (more)