Three BNSF SW1000s sit in a yard. Photo taken aboard the westbound Rocky Mountaineer.
CP 8651 leads a short intermodal with mostly baretables, into Guelph Jct while the conductor gets a clearance from the RTC to enter the single track OCS part of the Galt sub.
A light power move rolls through Coakley siding on their way to pick up a load of autoracks.
An all CN consist leads an eastbound CP manifest on CP's Galt Sub.
An eastbound manifest with three SD40-2s and an AC4400 is about to hit the mileboard to Trenton.
The London pickup is seen heading back to London after having completed some work at Galt.
A Capitol Corridor train arrives into Emeryville with a P42 in the lead.
Two veteran SD40-2s, one being a widecab, lead an eastbound intermodal by the VIA station in Woodstock.
Three SD40-2s lead a westbound manifest through Guelph Jct. What a sound it was to hear three 645's throttling up as the engineer notched up on the throttle!
The London Pickup returns through Woodstock with a good amount of autoracks in tow from the Toyota plant in Cambridge.