Having just worked New Hartford L570 has 17 more miles till the road work is finished then time to put the train away.
150 car train with 2 SD's rolls by at track speed 25 MPH, Yes it Needs paint!
Parked and needing a new crew, There's a lot of that going on today, 4 trains needing someone to run them.
First good pull out of Waterloo and this Ethanal trains not losing to much speed.
Making it's way over and down another hill their well on the way to Chicago.
Making it's way North and finely out of the trees.
Having pulled the end of the into the yard a cut has been made and is now shoving a cut into a track.
Passing over the Cedar River with the last bit of sun about to set behind the hill.
With over a mile worth of train behind the power they are still pulling hard with most of the train still on the up hill side.
Passing a MILW Depot the arch is over line that went to Austin,MN and was the original line to St Paul,MN before the River Sub was in.
Just getting a roll on after the their stop and snaking there way out of town.
On its South bound run Having left Mabel Rock its rocking and rolling to Green, This job works 24-7 the trick is getting running South at the right time of day.
On its South bound run at first light, This job works 24-7 the trick is getting it running South at the right time of day.
First train after sunrise with a nice windmill.
Streator Jct (NS) to KC train