It's a busy morning on the Boston & Maine at Ayer, MA. From right to left are train MERU (Mechanicville, NY, to Rumford, ME, B&M/MEC runthrough) behind second generation power, train EDCO (East De... (more)
Light snow is falling as an EMD quartet swings through East Fitchburg, MA, with train MERU (a Mechanicville, NY, to Rumford, ME, B&M/MEC runthrough). Three GP40-2s front a trailing GP7 that was pr... (more)
Boston & Maine GP38-2 204, joined by a second GP38-2 and a GP40-2, leads an eastbound freight out of Mechanicville, NY through Shirley, MA, on a bright late summer morning.
One of the five ex-PRR E8s that Amtrak rebuilt with HEP capability for use on Northeast Corridor Amfleet consists leads two-car train 153, the Beacon Hill, out of South Station. This was a Boston-... (more)
A Boston & Maine freight with pooled Maine Central and B&M Geeps glides south along the Connecticut River outside Brattleboro, VT. The lead unit, MEC 590, is a former L&N GP7 rebuilt with a choppe... (more)
A nice crowd waits at Roberts station in Waltham, MA, to board an inbound MBTA commuter train from Fitchburg on a fall morning. F40PH 1013 was the only unit of its class to receive the MBTA's hand... (more)
A smart trio of GP9s leads Boston & Maine train EDSA (East Deerfield to Salem, MA) through the town of Shirley on a bright summer morning. This job normally ran with matched sets of GP9s rather th... (more)
Built in May 1947 as GM&O F3A 880A. A Roger Puta Photograph
A Roger Puta Photograph
MBTA 1109 was an FP10 built May 1947 as GM&O F3A 807B. A Roger Puta Photograph
FEC GP40-2 441 running long hood forward at Fort Pierce, February 06, 1997.
The Boston and Maine had fifty GP9‘s, purchased in 1957 to replace the B&M’s FT’s. Here one of them switches at Groveton, New Hampshire.
Train 726, Shoreliner to Boston. A Roger Puta Photograph