The day after Christmas and two days after the big 2004 storm the PAL is also digging out. I four wheeled up a a snow filled crossing to get this shot. My hunt for the UK painted unit continues.
BNSF 2881.
The Marshall sub local begins it's day late in the afternoon. They have reported a lot of work today.
Digital Rebel
West bound through Thurmond, WV.
A GP39 at night in Keyser Yard
A Copper Basin Railway OT-1 loaded with 6,000 tons of copper oxide ore battles the short hill that leads to ASARCO's smelter.
Late returing Brookyn Hauler screams up the hill in Lake Oswego
Empty BNSF military train running on P&W
A rare GP39 (one of 20 for the C&O) and an ex-Chessie GP9 slug serve as yard pullers at Willard.
Symbol OT-1, with 6,000 tons of copper ore bound for the smelter, rolls through several cuts and prepares to enter tunnel 3 on this former SP branch.
Copper Basin Railway train OT-1 departs Ray Junction and tunnel 2 on its way to ASARCO's smelter at Hayden.
Copper Basin Railway GP39 401 leads a string of empty ore hoppers back to ASARCO's Ray Mine for reloading.