CN installed this equipment and it's designed to detect uneven track (soft spots) that might cause loaded ore cars to derail. There is this old ore car that works out of Proctor and a new car wit... (more)
MRS Logistica S/A from Brazil ordered 7 rack locomotives He 4/4 at Stadler Switzerland. As the locos extended Swiss loading gauge, they had to be moved by a heavy haulage transport from Stadler wo... (more)
The engineer of OSCR's Jackson local slows his train to a halt while a plan is formulated to remove this rig from the rails. The driver miscalculated a turn and a number of wheels became trapped b... (more)
A sea of Maintenance-of-Way Equipment covers nearly every inch of rail that makes up the 4,290 feet siding here at Roanoke. There's a lot of work that needs to be done, so a massive Tie Gang was ... (more)