Crawling up the Briar Mountain Branch with mtys for the coal loadout, mine run U20 and crew throw up a friendly wave. As shown, the branch cuts off amongst cliffs and is twisty throughout.
After suffering electrical problems, mine run U14 out of Jamboree 5 crosses Peter Creek. U14 will wait for congestion on the Pokey to clear before crawling downhill another four miles to the main.
Better get a good look at Glen Alum tunnel before the Heartland Corridor project begins. Mine run U23 backs up and will soon head up the Briar Mt. Br on the other side with two motors on the head ... (more)
Representative of the Pokey, bad order coal cars and a caboose sit at Cedar on the center siding. Cabs are still used along this stretch on mine runs, which consist of long backup moves up the bra... (more)