Three P&W units have just coupled onto an 80 car ethanol train that has just arrived off of CSX, and will soon be southbound for Providence. In the background, Q423 waits to depart later in the af... (more)
The southbound loaded Mt. Tom Coal Train crosses over the Oxbow in Easthampton, just north of the power plant on a perfect winter afternoon.
Power for PR-2 waiting by the Valley Barn
PR-3 with 2215 running past the Valley barn as its called, on their way down to the Amtrak Northeast Corridor, while the 3905, power for PR-2 that comes on duty later waits in the morning sun. 390... (more)
Providence & Worcester RR B39-8s 3905 & 3908 work train MFS-1, switching the New England Central RR interchange at Willimantic, CT on December 1, 2007.
P&W NR 2 rolls through Ledyard with a short train. After entering the Northeast Corridor this train switched with P&W NH 1 in Old Saybrook and NECR train 608 in New London.
P&W train NR-2's trailing power slips into the shadows along the USS Nautilus overlook park in Groton, CT. Canon EOS 20D, Sigma 18-50mm f/2.8 EX DC
Last run of P&W JC Coal on VRS (for now) as 3905 pulls empties eastward crossing Cuttingsville Bridge in the Green Mountains.
P&W coal empties in the Green Mountains on VRS trackage passing the Bartonsville Covered Bridge behind P&W 3905
Providence & Worcester coal empties in Vermonts' Green Mountains at Ludlow dropping down the east side of the Mt. Holly grade behind B39-8 3905
P&W train NR-2 heads into the NECR yard at the beginning of the first snow of 2005. Canon EOS 20D, Canon 70-200mm f/4L
The track in the foreground is the Amtrak Notheast Corridor.