NS 933 RP-E4D Slug is hanging out at the shops. Note in the background is the New 4486.
NS 4486 is a brand new rebuild and ready for service. That unit was rebuilt from 9147.
Built as Reading 3674. NS 3001 had undergone PTC upgrades and Cab Signal removal.
NS 25V Helper passes through CP SO, where they will cut off to push Y90 East.
A Y90 is working up the West Slope on the long straightaway between Portage and Cassandra. Looking high up, one can see the Jamestown Bridge in the background.
As a Welder works on a switch inside CP MO, A helper crosses over from Main 2 to the Track known as YD, to access the Service facility
New SD33ECO 6224 is getting the final work done on it before being placed into service. Note the horn on the nose of the unit. Unit is for Buffalo NY
Highhood SD40-2 1635 at the Juniata Shops, with an unknown fate.
A Brand New Rebuild. An SD40-3 waits outside the paint shop along with SD60E 7035. Having been re geared to 79MPH for the OCS Trains.
GE Test Bed C39-8E 8688 at the Juniata Shops. Note the damaged 6997 on the left, and SD70ACUs on the right. Sold off to PRLX.
NS 593 passes AR Tower Westbound as it crests the grade after climbing from Altoona. Note this track is normally for eastbounds.
NS 63V climbs up the Slide on Track 1 in Gallitzin. Due to MOW Work in the area. 5 westbounds were sent up the normally eastbound track 1, although the track is now equipped for traffic is both di... (more)
NS 8114 leads 25Z west at PT 263 in Summerhill.
Brand New AC44C6M rebuilt 4478 on it's first train, idles in South Fork while waiting to head west on 570.
The NB NRFF with a former NS Admiral Cab SD40-2 along with 5018 trailing, pulls upgrade through the searchlight signals at East Mahanoy Jct.