New EMD power during commissioning.
First and only BHP Billiton Iron Ore GE AC6000 CW to be painted in new corporate paint scheme.
Two BHP Billiton GE AC6000 CW' back to back showing the massive radiators needed to keep the big 7HDL cool.
Iron Ore train being loaded at Yandie loading facility. Note:"Pilbara" style cab addopted by the railroads in the Pilbara region of north western Australia.
A view of the BHP Billiton Iron Ore main locomotive workshop from inside the cab of an approaching DASH 8 loco.
6071 on the traction motor drop pit. Note: the GENII Sterable locomotive trucks the only kind in service in the world allowing for a massive 870 Kn starting tractive effort.
One of the original GE AC6000 CW prototype locomotives still in use at GE.
Loaded train waiting to go through ore car dumper #1.
The view from inside the cab of BHPb DASH 8 locomotive
New Pilbara Iron C44CW 9 locomotives on the General Electric test track track.
BHP taking delivery of new GE AC6000 CW locomotives
Train being loaded at Yandie #2 load out tunnel.
New corporate paint scheme.
Former DME