A Type 9 trolley waits at North Station now in the Subway. Once this was an elevated stop, click here to see how it was in 2004.
A set of UTDC 01700's arrive at the famous Park Street or as it was known, Park Street Under. These cars built in the late 1980's look like their older counterparts and can couple to them.
The 0700's built by Siemens replaced the 0600's #4 cars in 2007. Seen at the new Airport with "MBTA Dog" at the controller. Here, trains switch between overhead and 3rd rail.
01500's built by Pullman Standard 50 years ago arrive at Dowtown Crossing with a friendly operator. These cars I rode as a kid are marked for retirement, but for now still serve the T.
Variety Night At The BET. The shop pits were full on the night of July 21, 2021 at the Massachusetts Bay Transportation Authority (MBTA) Boston Engine Terminal in Boston, Massachusetts. Pee... (more)
Soon? One of Amtrak's new Avelia Liberty trainsets travels south to Philadelphia. As of late, the Acela II's debut has been delayed until 2024, more than 3 years after the original plan.
Box In Boston. On July 7, 2018, Amtrak/Amtrak Downeaster Train 690 was arriving at North Station in Boston, Massachusetts under some beautiful summer morning sunshine with F40NPCU (Non-Powe... (more)
F40's ruled South Station back in 1993. A newer F40PH-2C is joined by "class unit" F40PH 1000 on a quiet, cloudy morning in Boston. The construction work that is visible here is a sign o... (more)
Airport Arrival. Massachusetts Bay Transportation Authority (MBTA) 700-series no. 0774 (Siemens, 2007-2009) is the lead motor on an inbound Blue Line train, erroneously signed for Wonde... (more)
Trolley Tunnel. Massachusetts Bay Transportation Authority (MBTA) Type 7 LRV no. 3671 (Kinki Sharyo, 1986-1988) is seen arriving at Park St Station on the Green Line, operating an E ser... (more)
Inbound after crawling on the T's sluggish March '23 speed restrictions.
PAR 1 returning to Boston from Worcester Massachusetts after it was showcased for a railroad exposition along with some MBTA equipment.
Wrong Railer. Due to the demolition of the Government Center parking garage, on Saturday, January 14, 2023, Orange Line trains from Oak Grove were turning at North Station on the inbound pl... (more)
"Token Block Signaling on the Orange Line"
On the chilly evening of January 14th, 2023, a MBTA Inspector is seen "passing the baton" to a train operator before removing a portable t... (more)
"Through the Boston Underground"