Running east on main #1 this BNSF train exits tunnels #2.
The BARPIC gets a green at Atwood after waiting for a westbound Metrolink to pass. A sweety wedgie!
UP 7605, GE demonstrator engine and UP 7606 make their maiden voage to Los Angeles for the UP/GE Green Locomotive Technology Tour.
Two "Green Goats" await their crew for the day before they start their work along the Riverside Lead.
Lightpower sits at the wye at Old Colton Yard as a stack train proves to be the train crossing in front of this sign that seems to have no other purpose.
A eastbound UP stack train powers it's way up the steep grade at Silverwood
A UP stack train crosses the Alray Trestle as it makes it's way through the Cajon Pass after being diverted off the BNSF Cajon Sub,
A UP stack train passes through Mormon Rocks and crosses Cajon Creek as it makes it's way through the Cajon Pass after being diverted off the BNSF Cajon Sub,
An eastbound passes under the westbound control signal in Verdemont.
At the top of Banning Summit this sign warns engineers of the steep grade ahead going into Palm Springs.
A ballast cleaner works in between Mormon Rocks on the Plamdale Cut-off.
A southbound manifest taking the s-curves down South Canyon.
A eastbound stacktrain crosses the Santa Ana River using a bridge built in 1904. In the background is Mt. Rubidoux.