Breaking the silence of a still Minnesota landscape, DMIR 408 leads a four pack EMD consist and 145 ore cars at the control point Nugget on the CN Iron Range sub as they continue the trek to Two H... (more)
Always nice to get Missabe era signals and engines together. On duty at 0100 in Two Harbors and arriving at U.S. Steel Minntac at 0500, they began loading at 0530 and finished the last car at 072... (more)
The local is on the Montreal Subdivision mainline crossing West Side Canal Bank Track on the Lachine Canal. Two of the five crew members are getting off to line the switches for the local to reve... (more)
The Keenan Switch job passes some long dormant signals along the CN Iron Range Sub as the head back to their namesake yard. These signals are what remains of tracks laid by the Duluth, Missabe and... (more)