The Guilford era brought many changes to the Delaware and Hudson. Lightning stripes are succumbing to Guilford's grey, a lot of power from the Boston & Maine, Maine Central, and Springfield Termin... (more)
This set of D&H lightning stripes, the last 2, ran together on the D45 local for 4 weeks in the Summer of 2014. This was their last NB run together for the 4 week stretch. The 2 units are pulling ... (more)
The S&NC's BL2 rolls 19 loads of stone down the CP Main at CPC36 on its way to interchange with Canadian Pacific at Saratoga Yard. This was the first loaded stone train to be interchanged to CP.
BL2 Revenue Freight. The first loaded hopper train to run on the former D&H Adirondack Branch since November 18, 1989 rolls SB over the Sacandaga River on October 30, 2014, almost 25 years after t... (more)
BL2 Revenue Freight. The first loaded hopper train to depart North Creek since November 18, 1989 rolls SB just after noon on October 30, 2014, almost 25 years after the last hopper cars of ilmenit... (more)