A pleasant afternoon finds two BLE locomotives and train of ore cars rounding the bend south of Iron Jct. about to duck under the Highway 37 overpass heading along the Missabe sub.
BLE sisters have their train loaded out and taking the light at Largo heading to the Fairlane loop track about ten miles away with taconite bearing rock.
How cool is this in 2022. BLE 906 and sister BLE 909 bring taconite rock loads south and meet up with DMIR 404 and sister DMIR 406 bringing the empties north along the CN Missabe sub.
BLE 906 and sister BLE 909 continue to load rock at United Taconite's Thunderbird mine coarse crusher while a production truck rumbles by on its way to feed the crusher more material.