The 1201 shoves a cut of centerbeams down the Olympic Panel spur while PSAP power waits to move up the main to put its train together. The Simpson mainline crosses the PSAP main just this side of... (more)
The mid-day job emerges cab forward out of the forest about 2 miles out from its return destination in Shelton.
In the first month of resuming normal operations after a line closure the mid-day log train nears Mill 5 at the end of the line. The 1201 is on the end of the train as a helper coupled behind two... (more)
At the foot of Goldsborough Creek Canyon the 1201 emerges from the shady woods and crosses the bridge eastbound into warm sunlight on the last day of winter. The first part of the train was empti... (more)
As it leaves the Dry-sort yard the 1201 is crossing Hanks Lake Road heading back to Shelton. Mt Washington and Mt Ellinor are seen in the distance.
the 1201 crew shunts loads around 4 PM on the Simpson property in preparation for the next trip out of Shelton.
The 1201 leading a log train near Chappell Crossing on the return to Shelton from Mill 5.