Helpers ahead lead an all EMD consist out of Galitzin Tunnel.
A westbound's helpers pass beneath the signal bridge at Lilly.
A four pack of helpers hold back Y90 on track one while 20Q heads east on track two.
Light power hustles east on track two.
A total of 6 SD40-2s at full throttle shove Y90 and 20Q up the West Slope towards the summit at Galitzin.
Light power passes some of the newer industries on the south side of Bethlehem.
The people fishing pay no mind to Q434's passing.
Q118 is crossing from Bear Mountain State Park to Iona Island.
The last in an afternoon rush, Q156 heads south.
Spring has arrived as foliage starts to bloom and John Deer combines move east.
The last in a morning eastbound parade, 18G rolls through Bound Brook.
The rising sun lights up 20K on a cold morning.
The Tropicana train storms east through Bound Brook.
The power from 38T lays over beneath the Hill to Hill Bridge. The signal from CP JU and some NS road power sitting on Old Main Four can be seen in the background.
An H1 dash 9 leads tis mixed freight into Winslow.