Back in 2013 our normal second engine for coal trains, DM&IR #316, was down with electrical issues. Here we the DMIR #193 lugging 122 empties into Rices Point Yard with all the billboards and sigh... (more)
As part of the massive double tracking project up Steelton Hill in Duluth, CN is building new bridge over 108th Ave West. The old bridge and track alignment can be seen in the background.
RS-11s 3600 and 3609 finish switching a westbound freight at the DWP yard on the hillside in the west end of Duluth. Missabe's Proctor hill main is above this yard on the hillside. The white flag... (more)
CNW 4406 and 4401, GP15-1s, pair up on a transfer to/from the DWP connection in downtown Duluth on a beautiful summer day in 1977. By the mid-80s everything would change and this area would be par... (more)
All is quiet now, as a few passerby take notice of a hulking train passing them. In December however, the tracks the train is directly on, from the pole with the sign all the way back to the end o... (more)