There was a lot more cold and more snow 4 years ago. With one GE up front and one on the rear, this oil empty speeds along on the way back to Canada. The DPU clatters over the Barron Sub switch as... (more)
U716 loads at UTAC's Fairlane processing plant with BLE 909-904-906 for power. Once loaded, the 137 car train will head back south to Proctor as U717. There are five B&LE tunnel motors assigned to... (more)