Timetabled traffic through the new 15,4 kilometer long Ceneri Base Tunnel (CBT) between Camorino (near Giubiasco) and Vezia (near Lugano) will start with change of timetable in december this year.... (more)
Two "Giruno" highspeed trains RABe 501 of the SBB in multiple control are running the IC 10463 (1463) of the line IC2 from Zürich via Arth Goldau-Bellinzona to Lugano. The train will en... (more)