The Manistee yard job comes around the lake and through East Lake as it heads for Stronach for a crew change. This was about the end of fall peak season and the 3000 added a nice amount of color.
Shortly after running a group of empty subs to Zug Island to be loaded, 459 returns south with a couple loads for the caster. The caster was screaming for fresh metal, so as quick as the furnaces ... (more)
Shortly after running a group of empty subs to Zug Island to be loaded, 459 returns south with a couple loads for the caster and is now about to make the delivery as it reflects on some fresh pond... (more)
A pair of former CEFX/SP EMD's power a short Flat Rock turn back south after interchanging with the CN at FR. The crew will take this train down to Delta Oh. These two have been bought from CEFX a... (more)