The Skoda Santa-Fe #205-7M is arriving at the Rio Fiorita coal loading facility with an empty train. A Bernd Seiler charter.
The train arrived just at the right moment. One last ray of sun is illuminating the tender of the Santa-Fe #205-7M as the train is crossing the Capivari bridge.
A coal train hauled by the Jung Mikado #5 has just arrived at the Capivari station. The locomotive has been built in Germany in 1954. She is just one year older than me!
An empty coal train hauled by the ALCO Mikado 153-1M from the Dona Teresa Cristina railway is climbing up to Urussanga in the warm evening light. A Bernd Seiler charter.
A loaded coal train hauled by the ALCO Mikado 153-1M from the Dona Teresa Cristina railway is running from Urussanga to Tubarao. A Bernd Seiler charter.
An early morning sky silhouettes the 204 as it departs Tubarao with empties for the Lauro Mueller mine. EFDTC had three 2-6-6-2's for the steeply graded Lauro Mueller branch.
The EDDTC hauled coal from several mines to the port of Imbituba. This is a train of empties leaving Imbituba.
Metre gauge coal line in southeastern Brazil.