SOO mixed freight with two SD60's running elephant style is coming off the SOO River Sub and entering the Joint Line Sub at St. Croix interlocking at 4:12PM. From here to St. Paul trackage is shar... (more)
They're back....After spending a year and a half in storage due to a down turn in traffic, a pair of BNSF SD60M's are back on the road hauling freight.
The Empire Builder left the Twin Cities right on time, but 25 miles to the southeast that is no longer the case. The dispatcher recieved a signal that the lift bridge across the Mississippi in th... (more)