Sunday train to Patchogue seen traveling thru Signals S484 and Babylon 60. Engineer Joe Tischner waves from the 403 as he heads eastbound on the Montauk Branch with the next stop Bay Shore.
Train to Oyster Bay passing the Station at Bellerose on the Main Line. Bellerose serves the Hempstead Branch.
The Huntington-Port Jefferson scoot is preparing to stop at Kings Park. PL signals slated to be replaced are guarding Fox Interlocking.
Second Day of New York City Phase 1 on the LIRR Main Line. Train to Port Jefferson passes Queens 4 42W signal that protects westbound moves on the Hempstead Branch.
Train 8701 with DE30AC 412 pushing over N. Grove Street towards the Freeport Water Tower. Two hours plus sees 4 eastbound and one westbound diesel powered trains which serves the Montauk Line east... (more)
View from above the Montauk Branch from the pedestrian bridge that connects Orinoco drive to Union Blvd. Essential train bound for Montauk.
Eastbound Oyster Bay Train 6502 thru Queens 3 signal bridge on Main Track 2 lensed from the Bellerose Station platform.
Train to Montauk rounding the curve as it approaches the Arthur Avenue RR Crossing in Brookhaven.
After arrival at Patchogue local Babylon-Patchogue scoot has taken the siding. This move to get out of the way of Eastbound Train 8732 to Speonk.
Train from Montauk heading towards Babylon their next stop. Bridge 4 & 5 seen in the distance that control Montauk 1 & 2 by Babylon Tower.
Thru the PL Signals at Kings Park as the scoot heads to Northport its next stop. Thru Fox 1 2W signal at Fox Interlocking.
The Greenport Scoot heading thru the RR Crossing on Main Street.
Heading into the station on a snowy day.
Babylon-Patchogue Scoot about to platform at Patchogue the last stop.
After the snow at Northport Station.