P17-EV120-P14 returning from an infrastructure evaluation run to Warrnambool pass through Williams Landing.
S311-N464-T381 prepare to attach to an SSR grain consist at the Allied Mills terminal in Kensington.
T381 runs around an SSR grain consist at the Allied Mills terminal in Kensington.
N464-S317-S312 with an empty SSR grain train from Appleton Dock at Footscray.
N464-S312 with an SSR grain train at Appleton Dock.
CLP9-BRM001-C505 shunt an SSR grain train at Appleton Dock.
P16-EV120-P17 returning from an infrastructure evaluation run to Belgrave approach Burnley.
C504-CLP9-BRM001 with an SSR grain train at Appleton Dock.
N463-N455 on hire to SSR from V/Line lead an empty grain train out of Appleton Dock.
CLP12-CLP9-C504 approach Sims Street Junction with an empty SSR grain train to southern NSW.
CLP12-CLP9-C504 with an SSR grain train at Appleton Dock.
GM10 and GM22 with the AK cars track inspection train power upgrade through Glenroy.
GM10 and GM22 with the AK cars track inspection train in platform 2 at Southern Cross Station.
N464 on hire to SSR stabled with a grain consist at Kensington.
CLP9-CLP12-BRM001 with train 7CM4 from The Rock to Appleton Dock at Coolaroo.