DFZ2403, with DFZ2406 out of sight on the rear, brings a consist of woodchips through the unloader at the port of Albany.
DFZ2403&DFZ2405&DFZ2402 powering out of Tilley with a rake of 1763 loaded Karara ore train.
DFZ2403, DFZ2405 & DFZ2402 work a Karara Mining iron ore train 1763 just south of Morowa on the salt flats on a chilly winters day. KML had then recently started trucking ore to Perenjori to be lo... (more)
DFZ2403/DFZ2405/DFZ2402 working 7763 loaded iron ore from Perenjori hard across the Greenough River bridge at Eradu, east of Geraldton. These unmodified DFZ locomotives were the only Geraldton bas... (more)
The bright yellow of the new QR National colours contrasts with the black sky as DFZ2403/ P2513/ P2516 haul a loaded iron ore through the great australian named Moonyoonooka on 18 March 2012.
DFZ2403-P2515 power up the grade at the old locality of Grants with a Loaded ore train bound for Geraldton. DFZ2403 is the latest release in the New Queensland National Livery.