NS 232 destined for Savannah is southbound at Jackson, Georgia in February of 2004 with a NS GP60, BNSF GP60 and NS SD40-2. (Slide Scan)
Traditionally-styled locomotives and signals
GP60 7112 does it's best Alco impersonation as it leads L75 out of the siding and past the endangered NKP bracket signal at the West end of the Continental siding. The trailing GP40-2 was offline ... (more)
L75 heads back to Fort Wayne after working Protec in Leipsic, led by a GP60/GP40-2 combo.
31Q heads past the Sytle G signals at Pinola on its way to Chicago.
NS 7112 takes the signal at mile post 419
An East Bound freight smokes it up trying to gain speed with an entire train of loaded steel coils.
Lone GP awaits work orders while eastbound No. 111, with pipe loads stacked higher than auto rack cars, is in background.
922 tied down in the Bristol Yard with a GP60 for power.
P61 westbound at Elmwood with the throttle wide open.
The crew of NS train 349 waves to a waiting CSX MoW crew on NS/CSX shared trackage at Cary, NC.
350 throttles up out of Linwood Yard behind a trio of GP60s.
The conductor of NS train 350 inspects train 349 as it passes. Meanwhile, an NS work train sits on the siding.