Even from over 1000' feet below, you can still tell when Kroflite's fireman opens the firebox door to add more coal. 0-2-2-0 10 (the lower train) has just cleared Long Trestle, while 0-2-2-0 3 is ... (more)
Mount Washington 10 Kroflite begins its abbreviated winter journey up the mountain as it digs into the first incline, right outside Marshfield station. Note the open firebox door and the silhouett... (more)
The engineer strikes a classic pose as he moves Mount Washington 10, Kroflite, backs towards the station platform after coaling up.