CN 5500 leads the Q620 into Selkirk from Montreal via Syracuse. The 5500 is the class unit built in 1985 as the 9900 as part of a 4 unit order that predated the rest of the fleet which was delivered in 1989. EMD designated these first 4 units as SD50AF.