Just two days after being released from the paint booth, New England Central Railroad's ex-CORP slug set consisting of GP40CU 3809 and MT-4 809 (formerly an RP-E4 slug) are on their debut run, seen working the head end of the 5-7 day per week Burlington Electric wood chip train, symbol 500, that feeds the Joseph C. McNeil Generating Station in Burlington, Vermont. The slug set is seen pulling from the Swanton chip loadout on the Swanton Spur and crossing the Missisquoi River.