Six CN SW1200RSs make their way between Thonrton Yard in Surrey, BC and their North Vancouver terminal. This location, on BN trackage is where the power will diverge to its own line, run through a tunnel and over the Burrard inlet to their yards, grain elevators and BC Rail interchange.