About one half hour after having departed Toledo the Hauler is nearing the Yaquina River Valley community of Elk City. It is about eight miles into a 7+ hour, 74.7 mile long trek over the Coast Range Mountains bound for Albany, Oregon pulling a 14 car train loaded with wood products from the Georgia Pacific Mill at Toledo, Oregon. The consist also includes sister #3002, GP39-2 #2310 and the two slug helper engines #101 & #102.
Not
just heritage schemes, not just commemorative schemes - this album is devoted to some of the world's most interesting paint schemes, past or present.