It's the load test day for the new Hinterrhein bridge at Reichenau Tamins. The Ge 4/4 II # 620 of the RhB, in the special painting for the "RhB Club", serves as load for the bridge "Sora Giuvna" (little sister in Rhaeto-Romanic). In the background, Ge 4/4 II # 630 is pulling the Interregio # 1136 from St.Moritz to Chur over the old truss bridge from 1895. The track will change on 4th of november from the old to the new bridge, then the old bridge will be rebuilt and inforced. In about a year, there will be two parallel bridges over the Hinterrhein operational.